EXTRAS: Humewood School District, Renovated 2022, New Roof 2024
Level | Name | Size | Features |
---|---|---|---|
Ground | Family | 1.3 x 1.3 m | Open Concept, Hardwood Floor, Pot Lights |
Ground | Kitchen | 1.3 x 0.9 m | Open Concept, Hardwood Floor, Renovated |
Ground | Dining | 1.0 x 0.8 m | Open Concept, Hardwood Floor, Pot Lights |
Ground | Foyer | 0.3 x 0.4 m | Tile Floor, Pot Lights, Glass Doors |
2nd | Br | 1.3 x 0.9 m | Hardwood Floor, Large Window |
2nd | 2nd Br | 0.8 x 0.9 m | Hardwood Floor, Window, Closet |
2nd | 3rd Br | 0.8 x 1.2 m | Hardwood Floor, Window, Closet |
2nd | Bathroom | 0.5 x 0.6 m | Tile Floor, Renovated |
Bsmt | Bathroom | 1.2 x 0.6 m | Tile Floor, Renovated, Pot Lights |
Bsmt | Family | 1.2 x 2.4 m | Laminate, Renovated |