EXTRAS: Plumbing shut-off valves replace in May 2024; Electrical brought to code and checked in May 2024 (all new copper outlets and lighting replaced by an electrician)
Level | Name | Size | Features |
---|---|---|---|
Main | Kitchen | 1.1 x 1.9 m | Eat-In Kitchen, Stainless Steel Appl, W/O To Yard |
Main | Living | 1.9 x 1.0 m | Picture Window, Hardwood Floor, Combined W/Dining |
Main | Dining | 1.9 x 0.9 m | Combined W/Living, Hardwood Floor |
2nd | Prim Bdrm | 1.0 x 1.5 m | W/I Closet, Large Window |
2nd | 2nd Br | 0.8 x 1.3 m | Double Closet, Window |
2nd | 3rd Br | 0.9 x 0.9 m | Double Closet, Window |